VMI Safety Stock Calculator: What a Scanned Bin Actually Holds

Vendor managed inventory is usually sold as a service. Underneath it is arithmetic: how much stock a bin needs depends on how variable your demand is and how long the refill takes, and nothing else.

Set your own demand, lead time and service level below and watch the arithmetic run live.

Live simulator

Set Your Demand and Lead Time and Watch the Safety Stock

Change any field and every result below it updates immediately, including the simulated run and the comparison against ordering in bulk.

… pieces at top-up

 

One part number

Pieces per working day, averaged over the year.
Standard deviation as a share of the average. This is the input that actually sets your safety stock, steady demand needs very little.
Days from the bin being scanned to stock being back on the shelf. Safety stock rises with the square root of this, not in proportion.
How often the bin is counted and topped back up.
The probability of covering demand within any one cycle. Going from 95% to 99.5% is not 5% more stock, watch the safety stock move.
The way most C-parts are bought without a program, an infrequent bulk order covering months of usage.

Safety stock

…

…

Reorder point

…

Scan below this and the bin needs filling

Average stock held

…

…

90 days of this bin

Hover the line

A simulation, not a forecast: demand is drawn at random around your average with your variability, from a fixed seed so the same inputs always draw the same picture. Orange bands are days the bin ran dry.

Scanned bin against bulk ordering

The arithmetic, in full

Standard continuous-review inventory maths. Nothing proprietary, nothing hidden:

  • safety stock = z × σdaily × √(lead time)
  • reorder point = daily demand × lead time + safety stock
  • top-up level = daily demand × (scan cycle + lead time) + safety stock
  • average stock = safety stock + (daily demand × scan cycle) / 2

z is the standard-normal value for your service level, looked up rather than approximated: 90% = 1.282, 95% = 1.645, 97.5% = 1.960, 99% = 2.326, 99.5% = 2.576.

The comparison assumes bulk ordering holds half the order quantity on average and carries the same safety stock, which is generous to bulk ordering, because in practice an infrequent order usually carries more buffer, not less.

What this does not model: minimum order quantities, price breaks, shelf life, or multiple parts sharing a bin location. A real program has all four.

Explore the tools

Every Number on This Site Is One You Can Move

Bin Replenishment Simulator

Demand, lead time and service level in, safety stock and a simulated run out. You are here.

Grade and Environment Selector

Environment and load in, the grades that survive the joint out.

Cost of an Escaped Defect

PPM and catch rates in, the cost of a quality escape out.

Now get the number that is missing

You Have a Number. Now Get the One That Is Missing.

Everything on this page is modelled from the figures you entered. The piece price, the lead time and the tooling are ours to quote, and they are the numbers that turn this from an estimate into a decision. Send us the part, or the problem, and we will come back with both.

Prefer to talk it through?