VMI Safety Stock Calculator: What a Scanned Bin Actually Holds
Vendor managed inventory is usually sold as a service. Underneath it is arithmetic: how much stock a bin needs depends on how variable your demand is and how long the refill takes, and nothing else.
Set your own demand, lead time and service level below and watch the arithmetic run live.
Live simulator
Set Your Demand and Lead Time and Watch the Safety Stock
Change any field and every result below it updates immediately, including the simulated run and the comparison against ordering in bulk.
One part number
Safety stock
…
…
Reorder point
…
Scan below this and the bin needs filling
Average stock held
…
…
90 days of this bin
Hover the lineA simulation, not a forecast: demand is drawn at random around your average with your variability, from a fixed seed so the same inputs always draw the same picture. Orange bands are days the bin ran dry.
Scanned bin against bulk ordering
The arithmetic, in full
Standard continuous-review inventory maths. Nothing proprietary, nothing hidden:
safety stock = z × σdaily × √(lead time)reorder point = daily demand × lead time + safety stocktop-up level = daily demand × (scan cycle + lead time) + safety stockaverage stock = safety stock + (daily demand × scan cycle) / 2
z is the standard-normal value for your service level, looked up rather
than approximated: 90% = 1.282, 95% = 1.645, 97.5% = 1.960, 99% = 2.326, 99.5% = 2.576.
The comparison assumes bulk ordering holds half the order quantity on average and carries the same safety stock, which is generous to bulk ordering, because in practice an infrequent order usually carries more buffer, not less.
What this does not model: minimum order quantities, price breaks, shelf life, or multiple parts sharing a bin location. A real program has all four.
Explore the tools
Every Number on This Site Is One You Can Move
Bin Replenishment Simulator
Demand, lead time and service level in, safety stock and a simulated run out. You are here.
Grade and Environment Selector
Environment and load in, the grades that survive the joint out.
Cost of an Escaped Defect
PPM and catch rates in, the cost of a quality escape out.
Now get the number that is missing